Home Additions & New Construction

in Northern Utah

✦ ROOM ADDITIONS

More house, same address

Moving costs more than people expect once you count the realtor, the closing, and the fact that you liked your street. An addition keeps the neighborhood, the schools, and the yard you've already put work into.

The hard part isn't the new space — it's the seam. New footings have to match the settling of an existing foundation, the roofline has to tie in cleanly, and the siding has to look like it was always there. That's where additions go wrong, and it's what we plan around first.

  • Primary suites, bedrooms, and bump-outs

  • Second stories and over-garage additions

  • Sunrooms, mudrooms, and covered porches

  • Setbacks, permits, and structural tie-in

✦ BEFORE YOU COMMIT

Add on, finish down, or move?

Three ways to get more room. An addition isn't always the right one, and we'd rather tell you that at the estimate than halfway through.

Add on

Cost per sq ft

Highest of the three

Timeline

Months, plus design and permits

Limits

Lot size, setbacks, zoning

Right when

You need the space on the main floor, or the basement's already finished

Finish the basement

Cost per sq ft

Lowest — you own the shell

Timeline

Weeks, not months

Limits

Ceiling height, egress, it's below grade

Right when

You have unfinished space and need bedrooms or a family room

Move

Cost per sq ft

Depends — plus fees and a new rate

Timeline

Fast, if the right house exists

Limits

New street, new schools, what's on the market

Right when

The lot can't take an addition and the basement won't solve it

If finishing your basement is the better answer, that's work we do too — see our interiors page.

✦ NEW CONSTRUCTION

From bare lot to handed keys

Building from the ground up means forty separate things have to happen in the right order, and every one of them is somebody's schedule. The job of a general contractor is to own that sequence so you don't have to.

We take on custom homes and ground-up builds across Northern Utah — site work and footings through framing, mechanicals, finishes, and final inspection. You get one point of contact and one person accountable for the whole thing.

  • Site prep, excavation, and foundations

  • Framing, roofing, and exterior envelope

  • Licensed mechanical, electrical, and plumbing

  • Scheduling, inspections, and finish work

✦ GARAGES, ADUS & OUTBUILDINGS

If you can describe it, we've probably built it

Detached structures are still real construction — footings, framing, and usually power and permits. The difference is they're not bound to the house, which means more freedom in what they can be.

We build garages, shops, studios, and accessory dwelling units, plus the one-off structures that don't fit a category. Some of the work we're proudest of started with a client describing something that didn't exist yet.

  • Detached garages, shops, and RV storage

  • Accessory dwelling units and guest quarters

  • Pavilions, studios, and custom structures

  • Power, insulation, and year-round finishing

✦ HOW WE WORK

Four steps, and you know where you stand at each one

The same process whether we're building a deck, pouring a patio, or re-siding a house.

01

Free on-site estimate

We come out, walk the property, and talk through what's possible and what it costs. No charge, and no pressure to decide while we're standing there.

02

Written scope and schedule

You get the price, the materials, and the start date in writing. If the job needs drawings or a permit, we handle that with your city or county.

03

Build, managed start to finish

The same people start and finish your project. You'll know who's showing up, and you won't wait on somebody else's subcontractor schedule.

04

Walkthrough before we call it done

We walk the finished work with you. Anything that isn't right gets fixed before we consider the job closed.

✦ FEATURED PROJECTS

our work speaks for itself

✦ COMMON QUESTIONS

The ones worth asking any contractor

BEFORE YOU START

Do I need an architect, or can you handle the plans?

For many additions we can work from our own drawings. Larger projects, second stories, and anything with significant structural change usually need a licensed architect or engineer. We'll tell you which yours is at the estimate, before you've spent anything.

How does payment work on a project this size?

A deposit to start, then draws tied to completed milestones — foundation, framing, mechanicals, finish. You're paying for work that's already done and inspected. Whoever you hire, don't pay for a large project in full before it starts.

What does the permit process actually involve?

Plans get submitted to your city or county, review takes a few weeks depending on the jurisdiction and how busy they are, and then inspections happen at set stages through the build. We handle submission and schedule the inspections.

ADDITIONS

What affects the cost of an addition?

Square footage, whether you're adding a bathroom, whether you need an egress window cut, what the ceiling height and ductwork allow, and your finish level. A bathroom and an egress window are usually the two biggest single items.

How long does an addition take?

Plan on three to six months from first conversation to finished, with design and permitting taking a meaningful share of that before anyone breaks ground.

Can we stay in the house during an addition?

Usually, yes. Most of the build happens outside the existing envelope. The disruptive stretch is when we open the wall to tie the two together, and we'll tell you when that's coming.

Will the addition match the rest of the house?

That's the goal, and it's the part we plan first. We match siding profile, roofing, and trim as closely as what's still manufactured allows. On older homes an exact match isn't always possible, and we'll show you the closest options before ordering anything.

NEW CONSTRUCTION

How long does a custom home take?

Typically eight to fourteen months from breaking ground, depending on size, site conditions, and how quickly decisions get made. Design and permitting come before that.

Is the price fixed, or cost-plus?

This is the first thing to settle with any builder. A fixed-price contract puts the risk of overruns on us; cost-plus means you pay actual costs plus a fee, which can be cheaper but leaves the final number open. We'll tell you which we're proposing and why before you sign anything.

How do allowances work, and what happens if I go over?

Allowances are budget placeholders for things you haven't picked yet — fixtures, tile, countertops, lighting. We set them at realistic numbers rather than lowballing to make the bid look better, because artificially low allowances are the single most common reason a build comes in over budget. If you choose above the allowance, you pay the difference and we'll show you the math before ordering.

Do you work with construction loans?

Construction loans release money in draws, and the lender sends an inspector before each release. That means our schedule and your lender's have to line up. We've worked within that process and can coordinate directly with your loan officer.

GARAGES & ADUS

Can I put an ADU on my property?

Two to four weeks for a full gut, less for a refresh. Tile and waterproofing need proper cure time, which isn't worth rushing.

Does a detached garage need a permit?

Almost always, and it'll also be subject to setback requirements that affect where it can sit. We handle both.

✦ GET STARTED

Free estimates. No pressure.

★★★★★ 5.0 · 130+ reviews · Licensed & insured

Owner-led general contracting across Northern Utah — new builds, decks, sheds, basement finishes, and additions built for our winters

3364 S Van Buren Ave

Ogden, UT 84403

801-505-8211

[email protected]

HOURS

Monday-Friday: 9am to 5pm

Saturday: Closed

Sunday: Closed

© Copyright 2026. Shane’s Structures. All rights reserved.