Moving costs more than people expect once you count the realtor, the closing, and the fact that you liked your street. An addition keeps the neighborhood, the schools, and the yard you've already put work into.
The hard part isn't the new space — it's the seam. New footings have to match the settling of an existing foundation, the roofline has to tie in cleanly, and the siding has to look like it was always there. That's where additions go wrong, and it's what we plan around first.
Primary suites, bedrooms, and bump-outs
Second stories and over-garage additions
Sunrooms, mudrooms, and covered porches
Setbacks, permits, and structural tie-in

Three ways to get more room. An addition isn't always the right one, and we'd rather tell you that at the estimate than halfway through.
If finishing your basement is the better answer, that's work we do too — see our interiors page.

Building from the ground up means forty separate things have to happen in the right order, and every one of them is somebody's schedule. The job of a general contractor is to own that sequence so you don't have to.
We take on custom homes and ground-up builds across Northern Utah — site work and footings through framing, mechanicals, finishes, and final inspection. You get one point of contact and one person accountable for the whole thing.
Site prep, excavation, and foundations
Framing, roofing, and exterior envelope
Licensed mechanical, electrical, and plumbing
Scheduling, inspections, and finish work
Detached structures are still real construction — footings, framing, and usually power and permits. The difference is they're not bound to the house, which means more freedom in what they can be.
We build garages, shops, studios, and accessory dwelling units, plus the one-off structures that don't fit a category. Some of the work we're proudest of started with a client describing something that didn't exist yet.
Detached garages, shops, and RV storage
Accessory dwelling units and guest quarters
Pavilions, studios, and custom structures
Power, insulation, and year-round finishing

The same process whether we're building a deck, pouring a patio, or re-siding a house.
We come out, walk the property, and talk through what's possible and what it costs. No charge, and no pressure to decide while we're standing there.
You get the price, the materials, and the start date in writing. If the job needs drawings or a permit, we handle that with your city or county.
The same people start and finish your project. You'll know who's showing up, and you won't wait on somebody else's subcontractor schedule.
We walk the finished work with you. Anything that isn't right gets fixed before we consider the job closed.












For many additions we can work from our own drawings. Larger projects, second stories, and anything with significant structural change usually need a licensed architect or engineer. We'll tell you which yours is at the estimate, before you've spent anything.
A deposit to start, then draws tied to completed milestones — foundation, framing, mechanicals, finish. You're paying for work that's already done and inspected. Whoever you hire, don't pay for a large project in full before it starts.
Plans get submitted to your city or county, review takes a few weeks depending on the jurisdiction and how busy they are, and then inspections happen at set stages through the build. We handle submission and schedule the inspections.
Square footage, whether you're adding a bathroom, whether you need an egress window cut, what the ceiling height and ductwork allow, and your finish level. A bathroom and an egress window are usually the two biggest single items.
Plan on three to six months from first conversation to finished, with design and permitting taking a meaningful share of that before anyone breaks ground.
Usually, yes. Most of the build happens outside the existing envelope. The disruptive stretch is when we open the wall to tie the two together, and we'll tell you when that's coming.
That's the goal, and it's the part we plan first. We match siding profile, roofing, and trim as closely as what's still manufactured allows. On older homes an exact match isn't always possible, and we'll show you the closest options before ordering anything.
Typically eight to fourteen months from breaking ground, depending on size, site conditions, and how quickly decisions get made. Design and permitting come before that.
This is the first thing to settle with any builder. A fixed-price contract puts the risk of overruns on us; cost-plus means you pay actual costs plus a fee, which can be cheaper but leaves the final number open. We'll tell you which we're proposing and why before you sign anything.
Allowances are budget placeholders for things you haven't picked yet — fixtures, tile, countertops, lighting. We set them at realistic numbers rather than lowballing to make the bid look better, because artificially low allowances are the single most common reason a build comes in over budget. If you choose above the allowance, you pay the difference and we'll show you the math before ordering.
Construction loans release money in draws, and the lender sends an inspector before each release. That means our schedule and your lender's have to line up. We've worked within that process and can coordinate directly with your loan officer.
Two to four weeks for a full gut, less for a refresh. Tile and waterproofing need proper cure time, which isn't worth rushing.
Almost always, and it'll also be subject to setback requirements that affect where it can sit. We handle both.
★★★★★ 5.0 · 130+ reviews · Licensed & insured

Owner-led general contracting across Northern Utah — new builds, decks, sheds, basement finishes, and additions built for our winters
Monday-Friday: 9am to 5pm
Saturday: Closed
Sunday: Closed
© Copyright 2026. Shane’s Structures. All rights reserved.